Our Work, Our Focus, Our Passion

A few of our past Projects show casing previous work in a picture and a short description. It's a great opportunity to help you; our customer understand the context and background of our latest work.  Adding and building our community's one project at a time. We focus on preforming this work with safety as our number one core value. 

20230912_210355205_iOS.heic

Phase One

Water System Improvements
Webster, SD

This project was our largest and latest completion in 2023. The project started in the spring of 2022 and consisted of 3 miles of 1" water line, 493 new water services connections,  2,958 feet of 4" sewer line, 91 new sewer connections, and aprox. 2000 ft of water main. Just over $1M for our portion and we were sub contracted from B&B Contracting Inc.

Westside Condos
Delano, MN

WestSide Condos was one of our many commercial project. Consisted of 530' of Sewer main and 560' of 6" Water main. Two Hydrants and a complete Storm system with 7 manholes. We were able to preform this project early spring before the summer rush.

36FD95E5-D7F4-4EFF-88F7-10A17333FB0D_edi
IMG_2788_edited.jpg

Sibley State Park Amphitheater
New London, MN

Sibley State Park was our first state project in the books and was preformed at Sibley State Park, MN. This exciting project started in the spring of 2021. Consisted of removing the old amphitheater and adding this beautiful curved rock retaining wall. A fire pit near the bottom and later was added bench's and lighting.  

Sanitary Sewer replacement
Minnetrisa, MN

One of many local sanitary sewer repairs! This project was performed for the city of Minnetrisa, MN in the spring of 2023. This picture is from the beginning of the project; we had a continued sewage by-pass system in place to preform this repair.  

IMG_2609.HEIC
20231114_164533630_iOS.heic
63642597007__3DC8E55F-0815-45A8-905B-AB65CE6ABE2C 1.HEIC

Forced main Sewer Repair
Darwin, MN

Emergency work; Sewer repair project for the city of Darwin. A brief summary was this project had a damaged 6" sewer forced main and we only had short intervolves of time to preform the repair before the city had sewage backup damage. This can cause massive backing up issues if not preformed correctly.  

Sewer  Improvements Herried, SD

This project was started and complete in the summer of 2020. Consisted of 66 sewer services. 2,838 feet of new 4" sewer line. For the city of Herried, SD. Sub contracted off of B&B Contracting Inc. 

IMG_2080_edited.jpg
IMG_2496.HEIC

1 Mile of 15" HDPE Water main
 

This project I hired on and operated. The main focus was to learn and understand how to preform large diameter HDPE installation on rough and rugged terrane. The pipe was fused together using a off road induction fuser.

Michael Court Apartments
Hutchinson, MN

This project was packed with exciting challenges and one of our commercial project in Hutchinson, MN. Some of the challenges we had were deep sewer tie-ins. High water table and slimy clad. But we all enjoy this types of challenges on every project. 